The suggestion for thermal screen installation, fasten and maintenance after installation
The suggestion for installation of the thermal screen
You'd better install the thermal screen on the project after roof and side cover materials finish installation, because the wind will result to installation work more harder also some sharp objectives and some parts need removed scartch the screen if installed earlier.
The suggestion for fastening thermal screen
1. the screen should be hanging on the sliding system and no move for 24 hours to remove the tension occured in the process of installation.
2. The extra two side should be average and natural before fastening.
3. The screen should be parallel between free and fasten end to avoid the labor is not average in width direction and wrinkled on the surface of screen.
4. From middle to two side direction fasten screen at the same time in the natural statas( avoiding no too tighten to reduce the screen using life)
The suggestion for maintenance after installation
1. The middle of extra screen maybe longer than the two edges after fastening, the longer parts should be cut using thermal cautery knife carefully to make sure the extra screen uniform.( If nessary).
2. Stick the with U.v tape on the screen on the pre-cutting side, then cut the screen in the edge of tape direction using thermal cautery knife, this way can avoid the screen structure to damage and loose, then showing good appearance.(if necessary).